Beginning Tuesday, May 13, there will be detours for Spring Garden Ranch Road. The closure, located on the west end of Spring Garden Ranch Road, is needed for roadway resurfacing and to begin transitioning into work on the second half of the roundabout included in this project. No driveways will be impacted by this closure.
The planned detour routes are as follows:
- Motorists traveling east on Spring Garden Ranch Road wishing to travel to U.S. 17 will turn right on Argon Avenue, turn right on E Baxter Street, and then turn right onto U.S. 17.
- Motorists traveling south on U.S. 17 wishing to travel to Spring Garden Ranch Road will turn left on E Baxter Street, turn left on Argon Avenue, and then turn left onto Spring Garden Ranch Road.
- Motorists traveling north on U.S. 17 wishing to travel to Spring Garden Ranch Road will turn left on Spring Garden Avenue, turn left on Ponce De Leon Boulevard, turn left on E Baxter Street, turn left on Argon Avenue, and then turn left onto Spring Garden Ranch Road.
- Motorists traveling east on Spring Garden Avenue wishing to travel to Spring Garden Ranch Road will turn right on U.S. 17, turn left on E Baxter Street, turn left on Argon Avenue, and then turn left onto Spring Garden Ranch Road.
- Motorists traveling south on Ponce De Leon Boulevard wishing to travel to Spring Garden Ranch Road will turn left on East Baxter Street, turn left on Argon Avenue, and then turn left onto Spring Garden Ranch Road.
Volusia County Lane Closures
-
Motorists are advised that construction activities are underway along the southbound lanes of Ocean Shore Boulevard between East Granada Boulevard and Standish Drive. This work requires temporary lane closures and detours to safely accommodate drainage improvements, curb and gutter installation, and pedestrian enhancement operations. Beginning as early as Tuesday, April 29, the southbound lanes of Ocean Shore Boulevard between Amsden Road and Neptune Avenue will be closed for approximately three months. This is the second of three non-concurrent detour segments. The closure dates for segment three will be announced at a later date.
Detour maps can be found below under the 'Project Images' section. Please see the anticipated schedule from the Florida Department of Transportation (FDOT) below:
- Segment 1: The southbound lanes of Ocean Shore Boulevard will be closed between Neptune Avenue and East Granada Boulevard for approximately two months. Please note that the detour will be temporarily lifted for Daytona Bike Week and Spring Break from Friday, Feb. 28 through Sunday, Mar. 23. Construction activities will take place in the shoulder behind barrels. Roadway construction activities and the detour will resume on Monday, Mar. 24.
- Detour information: Motorists traveling south on Ocean Shore Boulevard wishing to reach East Granada Boulevard will turn right on Neptune Avenue, turn left on North Halifax Drive, and then continue south to East Granada Boulevard. This segment is complete.
- Segment 2: The southbound lanes of Ocean Shore Boulevard will be closed between Amsden Road and Neptune Avenue for approximately three months. This closure will be in place starting as soon as Wednesday, April 30.
- Detour information: Motorists traveling south on Ocean Shore Boulevard will be directed to turn right on to Amsden Road, turn left onto North Halifax Drive, and then continue south to East Granada Boulevard. From there, motorists can turn left to return to Ocean Shore Boulevard. Daytime flagging operations will be in place at the intersection of Amsden Road and Halifax Drive to facilitate traffic flow.
- Segment 3: The southbound lanes of Ocean Shore Boulevard will be closed between Standish Drive and Amsden Road for approximately two months. The closure dates for this segment will be announced subsequently.
- Detour information: Motorists traveling south on Ocean Shore Boulevard wishing to reach East Granada Boulevard will turn right on Standish Drive, turn left on North Halifax Drive, and then continue south to East Granada Boulevard.
- Segment 1: The southbound lanes of Ocean Shore Boulevard will be closed between Neptune Avenue and East Granada Boulevard for approximately two months. Please note that the detour will be temporarily lifted for Daytona Bike Week and Spring Break from Friday, Feb. 28 through Sunday, Mar. 23. Construction activities will take place in the shoulder behind barrels. Roadway construction activities and the detour will resume on Monday, Mar. 24.
-
Monday, May 19 to Wednesday, May 28: Motorists can expect an outside single lane closure on southbound State Road (S.R.) A1A at the intersection of S.R.A1A and Glenview Boulevard for paver removal.
No expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, May 19 to Wednesday, May 28: Motorists can expect an outside single lane closure on southbound State Road (S.R.) A1A at the intersection of S.R.A1A and Riverview Boulevard for paver removal.
No expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, May 5 to Monday, May 19: Motorists can expect inside single lane closures on northbound and southbound State Road (S.R.) A1A at the intersection of S.R.A1A and Glenview Boulevard for paver removal.
No expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, May 5 to Monday, May 19: Motorists can expect inside single lane closures on northbound and southbound State Road (S.R.) A1A at the intersection of S.R.A1A and Riverview Boulevard for paver removal.
No expected detours at this time.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Friday, Jan. 31., a traffic shift will be implemented on State Road (S.R.) A1A between Milsap Road and University Boulevard.
This traffic shift will convert the roadway to its final configuration and is expected to remain in place as the Florida Department of Transportation (FDOT) continues work on its project to improve safety and traffic operations in this corridor.
Northbound and southbound traffic has been shifted toward the medians to provide space for crews working in the outside lanes. The center turn lanes within the medians will be maintained.
The speed limit of 35 mph throughout the corridor will be maintained for the duration of the project.
FDOT advises motorists to reduce their speed, follow posted signage, and exercise extra caution in the work zone. Construction schedules are subject to change due to inclement weather or other unforeseen circumstances.