Project Details
Work Type: Resurfacing
Phase: Construction
Length: 3.666 miles
City:
County:
Road:
Construction Cost: $20.5 Million
Project Start: Early 2025
Est. Completion: Fall 2026
About

The goal of the project is to enhance safety and operations for all users and extend the service life of the roadway along the corridor. In addition to resurfacing this segment of S.R. A1A, the project will introduce subtle alignment shifts to help encourage safer driving speeds and enhance pedestrian safety. Traffic signal and lighting upgrades, as well as drainage improvements are included.

Pedestrian safety enhancements include wider sidewalks, midblock crossings with pedestrian activated signals, and upgraded curb ramps to comply with the Americans with Disabilities Act (ADA). 

To learn more about Rectangular Rapid Flashing Beacons (RRFBs), including how to use them:

Rectangular Rapid Flashing Beacon Video

How to Use the RRFB

Contact Information
Communications Team
Debbie Cople
(386) 740-3566
Debbie.Cople@dot.state.fl.us
Lane Closures
  • Monday, July 7 to Friday, July 11 from 7 a.m. to 7 p.m.: Motorists can expect intermittent inside and outside single lane closures on northbound and southbound State Road (S.R.) A1A from International Speedway Boulevard (U.S. 92) to Milsap Road for concrete removal and pouring, clearing and grubbing, limerock installation, paver removal, and drainage installation. 

    FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!