-
Sunday, May 18 to Saturday, May 24, from 6 p.m. to 6 a.m. the following morning: Motorists can expect alternating single-lane closures in both directions of North Orange Blossom Trail (U.S. 441), between Wadsworth Road and Sacred Oak Drive. Closures will shift between the inside and outside lanes as crews install a barrier wall along the project corridor.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy! -
Sunday, May 18 to Saturday, May 24, from 6 a.m. to 6 p.m.: Motorists can expect alternating single-lane closures in both directions of North Orange Blossom Trail (U.S. 441), between Wadsworth Road and Sacred Oak Drive. Closures will shift between the inside and outside lanes as crews work on widening the existing median.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Daily on Sunday, May 18, through Saturday, May 24, from 8 a.m. to 4 p.m.: Motorists should be advised that there will be rotating daytime northeast-bound and southwest-bound lane closures on State Road (S.R.) 200, for filling concrete median, and the installation of underground conduit/pull boxes.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.
-
Nightly on Sunday, May 18, through overnight Saturday, May 19, from 7 p.m. to 6 a.m.: Motorists should be advised there will be rotating overnight northeast-bound and southwest-bound lane closures on State Road (S.R.) 200 for excavating median areas.
FDOT encourages all roadway users to drive, walk, and ride with caution and courtesy!
*Lane closures are subject to change due to unforeseen events and weather.