-
8 p.m. Sunday, July 6, through 6 a.m. Friday, July 11
Motorists can expect nightly inside and outside lane closures northbound and southbound U.S. 1 (S.R. 5) from south of Pineda Causeway (S.R. 404) to Post Road.
These closures are needed for final pavement marking activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
8 p.m. Friday, July 11 through 6 a.m. Saturday, July 12
Motorists can expect inside and outside lane closures southbound US 1 (S.R. 5) at the intersection of Post Road.
These closures are needed for vehicle detection system activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
8 p.m. Sunday, July 6, through 6 a.m. Friday, July 11
Motorists can expect nightly inside and outside lane closures eastbound and westbound S.R. 405 from S.R. 50 to U.S. 1 (S.R. 5).
These closures are needed for paving activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!