EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Construction
Length: 5.729 miles
City:
County:
Road:
Construction Cost: $26 Million
Project Start: Summer 2025
Est. Completion: Fall 2026
About

The Florida Department of Transportation (FDOT) is improving safety and operations on U.S. 192
(West Irlo Bronson Memorial Highway/West Vine Street/State Road 530) from Bamboo Lane to
Main Street in Kissimmee. This project will repave and re-stripe 5.7 miles of the existing roadway to
provide 11-foot-wide travel lanes and a 7-foot-wide buffered bicycle lane in both directions of U.S.
192 from east of Bamboo Lane to Hoagland Boulevard. Additionally, the westbound left turn lane
onto southbound Oren Brown Road will be extended.


Pedestrian enhancements include new signalized crossing opportunities at Oren Brown Road,
Interior Street, and south of Four Winds Boulevard. At Interior Street, the project will add pedestrian
activated signals and reconstruct the existing bi-directional median. The crossing near Four Winds
Boulevard will be equipped with a new Pedestrian Hybrid Beacon (PHB), and a there will be a new
traffic signal, pedestrian signals, and crosswalks installed at Oren Brown Road. PHBs are pedestrian activated overhead signals that stop traffic to allow people to cross the road safely. Additional improvements include pedestrian curb ramp upgrades and sidewalk connections at Yates Road and
Mann Street.

To learn more about Pedestrian Hybrid Beacons (PHB), including how to use them:

Pedestrian Hybrid Beacon Video 

How to Use a PHB

Contact Information
Communications Team
Annabelle Bruzos Vega
(321) 319-8130
Annabelle.BruzosVega@dot.state.fl.us
Contractor
Hubbard Construction
For Media Inquiries Only
FDOT-D5Comm@dot.state.fl.us
Lane Closures
  • Sunday, September 14, through Thursday, September 18, from 8 p.m. to 6 a.m.: Motorists can expect nighttime eastbound and westbound intermittent lane closures on U.S. 192 from Bamboo Lane to Hoagland Boulevard for paving operations. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

  • Tuesday, September 9, through Friday, September 12, from 9 a.m. to 3 p.m.: Motorists should expect a westbound left turn lane closure at 4 Winds Boulevard and U.S. 192 for median widening work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy and to follow all detour signs.

  • Thursday, September 4 to Friday, September 12 from 9 a.m. to 3 p.m.: Motorists should expect eastbound and westbound of U.S. 192 from Old Vineland Road to Medieval Times Driveway left turn lane closures for median earth work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

  • Tuesday, September 9, through Thursday, September 11, from 8 p.m. to 6 a.m.: Motorists can expect nighttime eastbound and westbound intermittent lane closures on U.S. 192 from Bamboo Lane to Hoagland Boulevard for paving operations. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

  • Sunday, August 17, through Wednesday, October 15, from 7 p.m. to 5 a.m.: Motorists can expect nighttime eastbound and westbound intermittent lane closures on U.S. 192 from Bamboo Lane to Hoagland Boulevard for paving operations. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

Project Files