992600-6 US 1 at Lake Washington Rd./Riverdale Dr.- Install new signal heads with Overlap Phase
Project Details
| Work Type: | Intersection Work | 
|---|---|
| Phase: | Construction | 
| Length: | 0.01 miles | 
| Construction Cost: | $85,000 | 
About
The intersection of U.S. Highway 1 and Masterson Street will be upgraded from a flashing signal to a fully operational traffic signal with pedestrian crossings. In addition, new signal heads are proposed at the nearby intersection of U.S. Highway 1 and Lake Washington Road.
Both intersections are located adjacent to active railroad tracks. These improvements are intended to enhance traffic flow and increase safety for both motorists and pedestrians in the area.
Lane Closures
- There are no lane closures at this time.