Project Details
Work Type: Resurfacing
Phase: Design
Length: 2.511 miles
City:
County:
Road:
Design Cost: $2 Million
Letting: 08/26/2026
Estimated Costs
Construction Cost: $9.8 Million
About

The Florida Department of Transportation (FDOT) plans to make improvements along State Road (S.R. 44) from west of I-95 to east of South Walker Drive in New Smyrna Beach. This project will resurface the corridor, limited sidewalk construction and curb ramp reconstruction as needed to meet Americans with Disabilities Act (ADA) standards. Minor drainage improvements and reconstruction of the existing traffic signal at Sugar Mill Drive are included.

Contact Information
Design Project Manager
Randy Turner
(386) 943-5207
Randall.Turner@dot.state.fl.us
Design Firm
SRD, Inc.