EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Bridge Work
Phase: Design
Length: 0.045 miles
County:
Road:
Letting: 12/03/2024
Estimated Costs
Construction Cost: $925,000
About

The purpose of this project is to rehabilitate and maintain three bridges.

The first bridge is a culvert on State Road (S.R.) 419 over Gee Creek. At this location, the culvert will be cleaned and repaired. Another protective layer of concrete will be sprayed onto the culvert as a preventative measure.

The second bridge location is S.R. 434 over the Little Wekiva River. Multiple repairs will occur at this location, including waterproofing the bridge deck to protect it from cracking. 

Finally, joint seals are planned for the S.R. 436 bridge to Red Bug Lake Road will be replaced.

Contact Information
Design Project Manager
Jonathan Jastremsky
(386) 740-3418
jonathan.jastremsky@dot.state.fl.us