448800-1 Southbound US 1 from the FEC Railway bridge to Grace Street
Project Details
| Work Type: | Resurfacing | 
|---|---|
| Phase: | Construction | 
| Length: | 1.397 miles | 
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $3.6 Million | 
| Project Start: | Early 2025 | 
| Est. Completion: | Fall 2025 | 
About
The Florida Department of Transportation (FDOT) is repaving the southbound lanes of U.S. 1 (North Washington Avenue/ South Hopkins Avenue/ Edison Avenue) from the Florida East Coast (FEC) railway bridge to Grace Street in Titusville. The resurfacing will extend the life of the existing roadway.
Additionally, the project will include traffic signal upgrades at State Road (S.R.) 406 (Garden Street), Main Street, Julia Street, S.R. 405 (South Street), and Grace Street. To improve pedestrian safety, the project will improve crosswalks, reconstruct pedestrian curb ramps to meet current Americans with Disabilities Act (ADA) standards, and construct sidewalks connecting to the existing bus stops.
Contact Information
| Communications Team | 
|---|
| 
							
                               Ashley Ingham								
 (321) 634-6111 
                                                                        Ashley.Ingham@dot.state.fl.us
																		
									
                             | 
                        
| Contractor | 
| 
							
                               Carr Construction, LLC								
 | 
                        
| For Media Inquiries Only | 
| 
							
                               								
 
                                                                        FDOT-D5Comm@dot.state.fl.us
																		
									
                              | 
                        
Lane Closures
- There are no lane closures at this time.