448795-1 SR A1A Resurfacing from S 8th St to N 18th St
Project Details
Work Type: | Resurfacing |
---|---|
Phase: | Construction |
Length: | 1.82 miles |
City: | |
County: | |
Road: | |
Construction Cost: | $2.9 Million |
Project Start: | Early 2025 |
Est. Completion: | Spring 2025 |
About
This project plans to resurface State Road (S.R.) A1A from South 8th Street to North 18th Street in Flagler Beach to extend the life of the existing roadway. Pedestrian improvements are planned, including upgrading midblock crossings with pedestrian activated signals known as Pedestrian Hybrid Beacons (PHBs). The PHBs are planned at:
- South 8th Street
- South 3rd Street
- North 5th Street
Additionally, the existing crosswalk with a Rectangular Flashing Beacon (RRFB) at South 3rd Street will be relocated to South 5th Street.
Reconstruction of pedestrian curb ramps to comply with current Americans with Disabilities Act (ADA) standards is included.
Contact Information
Communications Team |
---|
Debbie Cople
(386) 740-3566
Debbie.Cople@dot.state.fl.us
|
Lane Closures
- There are no lane closures at this time.