445867-1 NB & SB SR A1A from Crescent Beach Drive to south of Minutemen Cswy
Project Details
Work Type: | Safety Project |
---|---|
Phase: | Construction |
Length: | 4.322 miles |
City: | |
County: | |
Road: | |
Construction Cost: | $3.9 Million |
Project Start: | Spring 2024 |
Est. Completion: | Early 2025 |
About
The Florida Department of Transportation (FDOT) is enhancing pedestrian safety along State Road (S.R.) A1A from Crescent Beach Drive to south of Minutemen Causeway. In this area, S.R. A1A is split, with S.R. A1A northbound known as Atlantic Avenue and S.R. A1A southbound known as Orlando Avenue. The project proposes to construct pedestrian crossings along S.R. A1A. Two of the crossings - on northbound and southbound S.R. A1A at South 1st Street -- will be equipped with Pedestrian Hybrid Beacons (PHBs).
To learn more about Pedestrian Hybrid Beacons (PHB), including how to use them:
Pedestrian Hybrid Beacon Video
To learn more about Rectangular Rapid Flashing Beacons (RRFBs), including how to use them:
Rectangular Rapid Flash Beacon (video)
Contact Information
Contractor |
---|
Carr Construction, LLC
|
Communications Team |
Ashley Ingham
(321) 634-6111
Ashley.Ingham@dot.state.fl.us
|
Lane Closures
- There are no lane closures at this time.