445220-1 SR 527 from Magnolia Ave to north of Rollins St
Project Details
About
The Florida Department of Transportation (FDOT) is improving safety and operations on North Orange Avenue (State Road (S.R.) 527) from Magnolia Avenue to north of Rollins Street in Orlando. This project will reconfigure the roadway from Magnolia Avenue to north of Ivanhoe Boulevard to provide one travel lane in each direction and additional on-street parking. In some areas, the curb will be extended to shorten crossing distances for pedestrians, and in other areas, floating islands will be built to help define the on-street parking.
Raised intersections will be constructed at Highland Avenue and Ivanhoe Boulevard to encourage safer driving speeds along the corridor. Additional improvements include milling and resurfacing the roadway, drainage modifications, upgraded pedestrian signalization, and curb ramps to comply with current Americans with Disabilities Act (ADA) standards.
To learn more about Rectangular Rapid Flashing Beacons (RRFBs), including how to use them:
Contact Information
Communications Team |
---|
Annabelle Bruzos Vega
(321) 319-8130
Annabelle.BruzosVega@dot.state.fl.us
|
Contractor |
Ranger Construction Industries, Inc.
|
For Media Inquiries Only |
FDOT-D5Comm@dot.state.fl.us
|
Lane Closures
-
Beginning Thursday, August 28, ongoing: Motorists should expect a northbound lane adjustment at Orange Avenue and New Hampshire Avenue. Crews will be working on storm striping and pavement markings in the roadway. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.