EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Construction
Length: 1.185 miles
City:
County:
Road:
Construction Cost: $5.5 Million
Project Start: Early 2025
About

The Florida Department of Transportation (FDOT) is improving safety and operations on
North Orange Avenue (State Road (S.R.) 527) from Magnolia Avenue to north of Rollins
Street in Orlando. This project will reconfigure the roadway from Magnolia Avenue to
north of Ivanhoe Boulevard to provide one travel lane in each direction and additional
on-street parking. In some areas, the curb will be extended to shorten crossing
distances for pedestrians, and in other areas, floating islands will be built to help
define the on-street parking.
Raised intersections will be constructed at Highland Avenue and Ivanhoe Boulevard to
encourage safer driving speeds along the corridor. Additional improvements include
milling and resurfacing the roadway, drainage modifications, upgraded pedestrian
signalization, and curb ramps to comply with current Americans with Disabilities Act
(ADA) standards.

Below are videos and tips on how to use these new signals:

Rectangular Rapid Flash Beacon (video)

RRFB Tip Card (English)

RRFB Tip Card (Spanish)

Contact Information
Communications Team
Annabelle Bruzos Vega
(321) 319-8130
Annabelle.BruzosVega@dot.state.fl.us
Contractor
Ranger Construction Industries, Inc.
Lane Closures
  • There are no lane closures at this time.
Project Files