EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Widening
Phase: Construction
Length: 4.319 miles
County:
Road:
Construction Cost: $18.3 Million
Project Start: Summer 2025
Est. Completion: Fall 2026
About

The Florida Department of Transportation (FDOT) is adding eastbound and westbound passing lanes on State Road 60 from Blanket Bay Slough to Peavine Road in Osceola County. These improvements are designed to enhance safety and traffic flow by providing drivers with designated areas for safer passing opportunities. The project also includes milling and resurfacing 4.3 miles of the existing roadway.

Additional improvements include reapplying audible and vibratory roadway treatments to alert drivers when they drift out of their lane. Upgraded signage and guardrail installation will further enhance safety along the corridor. Drainage improvements, including new storm drains and two new stormwater ponds, will also be added.

Contact Information
Communications Team
Annabelle Bruzos Vega
(321) 319-8130
Annabelle.BruzosVega@dot.state.fl.us
Contractor
C. W. Roberts Contracting, Inc.
Lane Closures
  • Thursday, November 6th through Friday, November 7th, from 9 a.m. to 3 p.m.: Motorists should expect eastbound and westbound intermittent flagging operations on S.R. 60 from Peavine Road to Florida Scenic Trail Roadway for drainage work. FDOT encourages the traveling public to drive, walk, and ride with caution and courtesy.

Project Files